Mailer sent to residents already engaged with a third-party supplier:3RD PARTY PARTICIPANT MAILER (PDF)
Already Enrolled with National Grid GreenUp or a Third-Party Supplier? If a consumer doesn’t receive a notification letter (for automatic enrollment), it’s because their account wasn’t eligible at the time of mailing (e.g. enrolled with National Grid GreenUp or a third-party supplier) and they will not be AUTOMATICALLY enrolled in the Town’s Program. However, everyone in Town is eligible to join the Program. They should instead receive an informational postcard and may opt-in at anytime. The only caveat is some (not all) suppliers have a termination fee for leaving their contract early. It is recommended that anyone with a third-party supplier call that supplier to confirm there isn’t an exit fee before they join the Town’s Program. The Town wouldn’t want someone to join the aggregation and then find out they were hit with a substantial termination fee.
To join Blackstone’s Program, you can do one of two things:
1. Visit colonialpowergroup.com/blackstone and click the OPT-IN button, then fill out and submit the Opt-In Form.
2. Call First Point at (888) 875-1711 and ask to join the Town of Blackstone’s Program.
For both of the above options, you should have your National Grid bill handy in order to provide some required information. Enrollments can only be processed on meter reads so it may take one or two billing cycles before taking effect.
What are the Town’s product offerings?
Standard Product: Meets MA renewable energy requirements. This product is being offered at $0.13052 per kWh for 18 months (April 2025 to October 2026).
Optional Product: 100% renewable, provides 37% National Wind Renewable Energy Certificates (RECs) above the state’s then-current minimum requirement for renewables [63% in 2025]. This product is being offered at $0.13218 per kWh for 18 months (April 2025 to October 2026).