Plumbing/Gas Fee Schedule
TOWN OF BLACKSTONE
PLUMBING AND GAS PERMIT FEE SCHEDULE
PLUMBING FEE SCHEDULE
*NOTE: Please reference page 2 of the application to see exactly what papers are needed to file a permit. If the permit application is turned in with out all required paperwork the application will be denied and there will be an additional $35.00 re-inspection fee assessed.
New Residence $250.00
New Fixtures $50.00 Each
Replacement Fixtures $50.00 For 3 Fix. $20.00 per
Backflow Preventer (Per Unit) $60.00
Run Pipe Line Connection Outside $50.00
Run Pipe Line Connection Inside $60.00
GAS PERMIT FEE SCHEDULE
New Single Family Residence $200.00
Replacement Appliance $50.00 For 3 Fix. $20.00 per
New Appliance $50.00 Each
COMMERCIAL AND INDUSTRIAL PLUMBING AND GAS
New Building – 3% of total job cost plus $200.00
Replacement Appliance $50.00
Propane Gas Service Installation $50.00
Backflow Preventer (Per Unit) $60.00
Sprinkler Head $60.00
All cards must be availble at time of inspection to be signed. If card is not available at the time of the inspection a $35.00 reinspection fee will be charged.
1. All fees will be DOUBLED when work has been started without a permit.
2. Re-inspection fee of $35.00 will be assessed when work fails inspection.
3. Re-inspection fee of $35.00 when the building or residence is locked at time of scheduled appointment.
4. A $35.00 re-processing fee will be assessed when a permit submitted is incomplete.
Including, but not limited to failure to include filing fee, insurance certificate and copy of license.
ALL RE-INSPECTION FEES MUST BE PAID PRIOR TO SCHEDULING THE RE-INSPECTION WITH THE OFFICE.
Effective 01 January 2018