Electrical Permit Fee Schedule

TOWN OF BLACKSTONE

ELECTRICAL PERMIT FEE SCHEDULE

RESIDENTIAL ELECTRICAL

 

*NOTE: Please reference page 2 of the application to see exactly what papers are needed to file a permit.  If the permit application is turned in with out all required paperwork the application will be denied and there will be an additional $35.00 re-inspection fee assessed.

 

MINIMUM PERMIT FEE IS $50.00 WITH THE EXCEPTION OF THE FOLLOWING:

New Residence                                                                                           $250.00

Multiple Family House (2 or more units)                                                     $150.00 Per Unit

First Ten Outlets, Switches, Plugs, Thermostats, Lights,

Electric Heaters, Etc.                                                                                   $  50.00

Additional outlets of Ten                                                                               $  50.00

Swimming Pools   

     Above Ground                                                                                        $  60.00

     Inground                                                                                                 $100.00

Solar Panels 2% of Estimated Value of Electrical Work

 

 

COMMERCIAL AND INDUSTRIAL

3% of job cost and                                                                                       $100.00

1. All fees will be DOUBLED when work has been started without a permit.

2. Re-inspection fee of $35.00 will be assessed when work fails inspection.

3. Re-inspection fee of $35.00 when the building or residence is locked at time of scheduled appointment.

4. A $35.00 re-processing fee will be assessed when a permit submitted is incomplete,

Including, but not limited to failure to include filing fee, insurance certificate and copy

of license.

 

ALL RE-INSPECTION FEES MUST BE PAID PRIOR TO SCHEDULING THE RE-INSPECTION WITH THE OFFICE.

 

 

Note: Electric water heater replacement must file an electric and plumbing permit.

 

Effective:        16 September 2015